The first larch plank being steamed in position

This photo shows the front end of the plank being steamed into position along with its sister plank on the starboard side being done at the same time.

 This photo shows the boat starting to take shape as it grow out from the keel.

 This close up shows the plank in position on the stem and before the rebates are planned on after it as cooled down

 The second plank being helded in place by old fashion peg cramps/

 Another photo of a peg cramp being used to hold a plank in place.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s